WALDRICH POREBA WPF 50/200 – Year 1986

Contact us for price

Category:

Description

Portal Milling Machine
WALDRICH POREBA WPF 50/200 was manufactured by the machine manufacturer WALDRICH POREBA.
Machine WALDRICH POREBA WPF 50/200 was built in 1986 year.

Length of the working table 8000 mm
Width of the working table 1600 mm
Maximum table load (evenly distributed) 50000 kg
Travel length of the quill 250 mm

– distance between columns: 2000 mm
– table working surface: 1600×8000 mm
– working height: 2000 mm
– speed range: 6-200-600 rpm
– spindle: ISO 50
– diameter of the quill: 250 mm
– quill extension: 250 mm

Shipping Policy

After paying 49 GBP £ 
You can learn its price now
Pay on PAYPAL 
PayPal Acceptance Mark
     or  Wire  Transfer  or   Credit Card


Machine Request  I Sell Machine  I  Guest Post    I   Stock Machines

Our Service Terms : 

1.) CNCBUL.com does not own any of the equipment listed for sale on this site!..
2.) All information, offers and prices on this site are subject to change by the Machine owner and are non-binding!
3.) We are not a stocking dealer of New & Used Metalworking Machinery.
We are an online technology company about used CNC Machine Tools & Machinery sector.
Our Machine Dealer Partner companies are a stocking dealer of New & Used Metalworking Machinery. 
The stocks of our partner machine dealers are always changing!
 The stock status of the machines varies instantaneously!
4.) Machine Price information learning fee is limited to only 1 machine . It does not cover all machines in the system!..
5.) Our aim is to inform you about the market value of the machine you are looking for.
If the machine for which you requested the price has been sold, offers of machines with the same features or equivalent are sent to you by our International Machine Dealer partner companies as a separate offer.
6.) After the payment is received, the machine price information is sent via  email or Whatsapp as PDF format.
7.) Machine price information transmission time is between 15 minutes and 6 hours. This period varies according to the demand for proposals, working hours, days and hours.
8.) You can enter your company’s billing information in the ‘Note to Seller’ section when making the payment.