Fulton FBS-250HP High Pressure Steam Boiler – Year 2022

Contact us for price

Description

Fulton Thermal Corporation FBS-250HP – Year 2022
High Pressure Steam Boiler

250PSI, Dual Fuel

Boiler
One (1) Fulton Model FBS-250, 250 HP Fuel-Fired Steam Boiler:
natural gas fired, modulated burner,
fuel train built to CSD-1 standards,
Siemens Linkage-less LMV-52, 460/60/3 motor voltage,
120/60/1 control voltage through an incorporated step down transformer,
complete with components suitable for indoor location, and shall have an input of 10,207 SCFH with an output of 8,370 MBH (8,625 lbs./hr.).
The forced draft fan blower motor is 10 HP and gas utility requirement has a dynamic minimum of 5 psig with a maximum droop of 5% (7”w.c.).

The boiler is a horizontal, three-pass, wet-back firetube design. The burner is an Oilon GKP-350 low emissions technology unit suitable for <30ppm NOx. This burner is Dual Fuel Natural Gas and #2 oil fired. The feedwater control strategy is on/off with feedwater valve included. Summary of Materials of Construction: The boiler(s) configured to emit emissions limits as follows: NOx <30 ppm, CO <50 ppm on Natural gas (corrected to 3% O2), Uncontrolled NOX on #2 oil. The necessary New Source Review, Source Permit and required Third Party Source Test shall be by others. NOTE: Steam output ratings are at 212°F feedwater temperature and 0psig. Operating Steam Pressure is 125 PSIG. Manufacturer: Fulton Thermal Corporation Model: FBS-250 HP: 250 Boiler Run Time: 898 Hours Steam Output: 8,625 (lbs/hr, F&A212°F) Btu/hr Output: 8,369,750 MBH Fuel: Natural Gas and #2 oil fired ASME Section: I Design Pressure: 250 PSI Trim Pressure (Safety Relief Valve): 150 PSI Operating Pressure: 125 PSI Boiler Rating: NEMA 1 Control Voltage: 120/60/1 Fan Voltage: 480/60/3 Date: 10/08/2022 Boiler Controls and Trim: ASME Certified, and CSD-1 Compliant NEMA 12 Panel Box Siemens LMV52 Combustion Control System Probe-type High Water alarm with auto reset, Secondary Low Water Cutoff with manual reset. High Limit and Operating Pressure controls Low Water light and door mounted reset Surface blowdown diptube and manual valve kit Feedwater stop and check valves Bottom blowdown (2) quick and (1) slow opening knife-type valves 6” dial steam gauge. ASME safety valves set at 150 psig. McDonnell and Miller No.157 primary low water cut out / pump control with tubular gauge glass. 6” flanged steam supply. Installation and Operation Manual Modulating Feed Water Control Valve with McDonnell Miller 193-7B Modulating Feed Water Control Valve with Differential Pressure Switch Conductivity Surface Blowdown Control with S.S. Sample Cooler Brand New Item Not Yet Received from Manufacturer Stack Economizer One (1) boiler economizer mounted on top of the boiler which will include the following items: Carbon steel economizer tubes with carbon steel fins. Carbon steel inner casing and tube supports. Inlet and outlet transitions integral to the unit including rolled angle flanges to the boiler stack outlet. Removable rear door for maintenance and inspection access. Safety Relief Valve. Unit is built to Section VIII of the ASME Boiler Code and is National Board registered to 600 psig design pressure at 700 deg F design temperature. *The boiler is a horizontal, three-pass, wet-back firetube design. * Removal, Rigging to load on customers truck included in listed price. Message for Shipping quote. * This boiler was installed 12/2022. * Manufacturers warranty still in effect. Shipping Information: Overall Dimensions: 102"W x 210"L x 101"H Shipping Weight: 25,700 Lbs.

Shipping Policy

After paying 49 GBP £ 
You can learn its price now
Pay on PAYPAL 
PayPal Acceptance Mark
     or  Wire  Transfer  or   Credit Card


Machine Request  I Sell Machine  I  Guest Post    I   Stock Machines

Our Service Terms : 

1.) CNCBUL.com does not own any of the equipment listed for sale on this site!..
2.) All information, offers and prices on this site are subject to change by the Machine owner and are non-binding!
3.) We are not a stocking dealer of New & Used Metalworking Machinery.
We are an online technology company about used CNC Machine Tools & Machinery sector.
Our Machine Dealer Partner companies are a stocking dealer of New & Used Metalworking Machinery. 
The stocks of our partner machine dealers are always changing!
 The stock status of the machines varies instantaneously!
4.) Machine Price information learning fee is limited to only 1 machine . It does not cover all machines in the system!..
5.) Our aim is to inform you about the market value of the machine you are looking for.
If the machine for which you requested the price has been sold, offers of machines with the same features or equivalent are sent to you by our International Machine Dealer partner companies as a separate offer.
6.) After the payment is received, the machine price information is sent via  email or Whatsapp as PDF format.
7.) Machine price information transmission time is between 15 minutes and 6 hours. This period varies according to the demand for proposals, working hours, days and hours.
8.) You can enter your company’s billing information in the ‘Note to Seller’ section when making the payment.