DNE LC3 3015 Fiber Laser BYSTRONIC (SHENZHEN) LASER TECHNOLOGY – Year 2021
Power: 6000W
Laser Type: Fiber
Sheet Size: 5′ x 10′
Max Positioning Speed X/Y: 3937 IPM
Max Simultaneous Positioning Speed: 5511 IPM
Bilateral Repeatability of Positioning of One Axis R (Following ISO 230-2:2014(E)): ±0.002″
Bilateral Repeatability of Positioning of One Axis M (Following ISO 230-2:2014(E)): ±0.004″
Edge Detection Accuracy: ±0.019″
Max Weight of Workpiece: 1,984 Lbs
Table Changeover Time: 24 s
Polarization: Unpolarized
Wavelength: 1 µm
Pulse Frequency: 1 – 2500HZ
Maximum Sheet Thicknesses:
Steel: 0.750″
Stainless Steel: 0.750″
Aluminum: 0.750″
Brass: 0.375″
Copper: 0.375″ Total Electrical Consumption of System: 29kW
Equipped With:
– Max Photonics MFMC 6000W Pro Series Power Source
– Donaldson Torit Fume Extraction System
Our Service Terms : 1.) CNCBUL.com does not own any of the equipment listed for sale on this site!.. 2.) All information, offers and prices on this site are subject to change by the Machine owner and are non-binding! 3.) We are not a stocking dealer of New & Used Metalworking Machinery. We are an online technology company about used CNC Machine Tools & Machinery sector. Our Machine Dealer Partner companies are a stocking dealer of New & Used Metalworking Machinery. The stocks of our partner machine dealers are always changing! The stock status of the machines varies instantaneously! 4.) Machine Price information learning fee is limited to only 1 machine . It does not cover all machines in the system!.. 5.) Our aim is to inform you about the market value of the machine you are looking for. If the machine for which you requested the price has been sold, offers of machines with the same features or equivalent are sent to you by our International Machine Dealer partner companies as a separate offer. 6.) After the payment is received, the machine price information is sent via email or Whatsapp as PDF format. 7.) Machine price information transmission time is between 15 minutes and 6 hours. This period varies according to the demand for proposals, working hours, days and hours. 8.) You can enter your company’s billing information in the ‘Note to Seller’ section when making the payment.